Jamshedpur: Tata Power has signed a Memorandum of Understanding (MoU) with Bharat Petroleum Corporation Limited (BPCL) to develop 110 kV power infrastructure to meet the 90 MW electricity requirement of BPCL’s Petro Resid Fluidized Catalytic Cracking Unit (PRFCCU) project at its Mumbai Refinery.
The collaboration aims to strengthen power connectivity for the refinery project while supporting the development of reliable electricity infrastructure for Mumbai’s growing industrial and commercial sector.
Also Read: One Night at the Call Center: India’s Worldwide Information Economy’s Unknown Workforce
₹250 Crore Investment Planned for Power Infrastructure
Under the MoU, Tata Power will provide 110 kV connectivity and undertake the design and development of the associated power infrastructure required to meet the PRFCCU project’s electricity needs.
The infrastructure development is expected to take approximately 24 months, subject to applicable approvals and project milestones. Tata Power and BPCL will make a combined estimated investment of around ₹250 crore towards the development.
Beyond meeting BPCL’s immediate power requirements, the project is expected to strengthen Tata Power’s transmission network in the Trombay area. This will help support anticipated growth in electricity demand from large industrial consumers and other major developments in the region.
Also Read: ONTHHPC Crowned Champions of 54th Nehru Junior Hockey Tournament After Three Years
BPCL’s ₹14,203 Crore PRFCCU Project to Boost Refining Capabilities
The PRFCCU project is a significant initiative in India’s refining sector and is described as the first project of its kind being executed in the country.
With a processing capacity of 3 million metric tonnes per annum (MMTPA) and an estimated project cost of approximately ₹14,203 crore, it is BPCL’s second-largest project currently under execution and the largest ever undertaken at its Mumbai Refinery.
The project is aimed at enhancing the recovery of higher-value products and supporting petrochemical diversification. By increasing domestic value addition, it is also expected to contribute to India’s energy security and the national vision of Aatmanirbhar Bharat.
Tata Power Plans 400 kV Transmission Facility at Trombay
As part of its long-term strategy to build a robust and future-ready power network for Mumbai, Tata Power also plans to strengthen its transmission infrastructure in Trombay through the development of a 400 kV transmission facility over the next five years.
The proposed facility is expected to enhance power evacuation capacity and support reliable grid availability for Mumbai’s industrial and commercial ecosystem.
The planned expansion reflects the growing need for stronger transmission infrastructure to accommodate rising electricity demand and support industrial development in strategically important areas.
Strategic Partnership to Strengthen Mumbai’s Energy Infrastructure
The collaboration brings together Tata Power’s expertise in power infrastructure development and BPCL’s investment in refining capacity and petrochemical diversification.
Through the initiative, both companies aim to strengthen Mumbai’s energy infrastructure, improve power connectivity for major industrial projects and contribute to India’s broader energy security objectives.
The agreement also reinforces Tata Power’s commitment to investing in transmission and distribution infrastructure to support long-term industrial growth, reliable electricity supply and national energy self-reliance.
Related News
- Jharkhand ONTHHPC Crowned Champions of 54th Nehru Junior Hockey Tournament After Three Years
- Jharkhand High Court Quashes Government Order to Cancel JSSC-CGL; Relief for 1,932 Candidates
- Jharkhand DPS Ranchi Honours 145 Primary Wing Students for Academic Excellence
- Jharkhand Preservation of the Traditions, Culture, and Identity of the Tribal Community is Essential: Chief Minister Hemant Soren












